Do you want to be a better CNC'er in 37 Seconds? Get Better Tool Life, Surface Finish, and Material Removal Rates Fast. It's that easy. You can install and get results now. |
CNCCookbook Fixture Calculator
Use this fixture calculator to determine if you'll save with a custom workholding fixture. Compare two scenarios on the left and right.
Fixture A |
Fixture B |
|
Description |
||
Build Time (Hours) |
||
Setup Fixture (Mins) |
||
Unload/Load Fixture (Mins) |
||
Parts Per Run |
||
Part Run Time (Mins) |
||
Fixture Run Time (Mins) |
||
Total Parts to Make |
||
Total Runs |
||
Total Machining Time (Mins) |
||
Total Machining Time + Setup (Mins) |
||
Total Machining Time + Setup + Build (Mins) |
||
Total Operator Loading Time (Mins) |
||
Total Time Savings (Mins) |
||
Total Load Time Savings (Mins) |
||
Hourly Billing Rate |
||
Total Cost Savings (ROI) |
Definitions
Repeat Run | Click to set Build Time to zero. On repeat runs, the fixture already exists. |
Fixture Plate | Click to reduce Setup Time to 1 minute. With a fixture plate, we're dropping onto pins. |
Palette Changer | Click to reduce Unload/Load time on Fixture B to 30 seconds. |
Build Time | The length of time it will take to build the fixture |
Setup Fixture | The time needed to setup the fixture on the machine so it's ready to use |
Unload/Load Fixture | The time needed to load material into the fixture and remove parts for the next run |
Parts per Run | Number of parts the fixture produces per run |
Part Run Time | Length of time to finish a single part on a run |
Fixture Run Time | Time to finish all the parts in the fixture on a single run |
Total Parts to Make | Total parts that will be made before the fixture is removed |
Total Runs | Number of runs required to make all the parts |
Total Machining Time | Total time to machine all runs |
Total Machining Time + Setup + Build | Overall time for the job |
Total Operator Loading Time | Time the operator will spend loading and unloading |
Total Time Savings | Total savings of Fixture versus the other fixture |
Total Load Time Savings | Total load time savings of Fixture versus the other fixture |
Hourly Billing Rate | The hourly rate you charge for the job. Need to calculate your Machine Hourly Rate? Try this CNC Machine Hourly Cost Calculator. |
Total Cost Savings (ROI) | Based on the time savings and hourly rate, this is your total cost savings. It's basically the ROI of Fixture B over Fixture A. |
Want more tools to be a better CNC'er? Visit CNCCookbook.com. |
Fixture Productivity Tips
Video: What's a Good Fixture Worth?
Copyright © 2017, CNCCookbook
Do you want to be a better CNC'er in 37 Seconds? Get Better Tool Life, Surface Finish, and Material Removal Rates Fast. It's that easy. You can install and get results now.
|
||||||||||||||||||
|